Pontoon Yacht Transformation: Black Water Tank, PVC Conduit, Marine Plywood
- Authors
- Published on
- Published on
- Name
- By Dushyant
- (@dishs)
In this thrilling episode of B is for Build, the team embarks on a daring mission to transform a pontoon yacht into a floating masterpiece. With a black water tank sourced from a Facebook Marketplace discovery, they dive into the nitty-gritty of boat plumbing. The tank, a crucial element for sinks and a bathroom onboard, undergoes meticulous welding and hosing to ensure smooth waste management at sea. As they tackle challenges like cable sizes and structural reinforcements, the team's determination shines through like a beacon in the stormy waters of boat construction.
Amidst the chaos of marine engineering, the team showcases their resourcefulness by repurposing a trapezoidal aluminum tank into a vital component of the pontoon yacht. With precision welding and strategic placement, they turn a simple tank into a cornerstone of the vessel's functionality. As they navigate the complexities of hydrodynamics and stability tests, the team's dedication to craftsmanship and innovation becomes abundantly clear. From building a wedge for the tank to reinforcing the hot tub area, every step is a testament to their unwavering commitment to excellence.
As the project progresses, the team's attention to detail and commitment to quality shine through in every weld and installation. From laying down PVC tubes for electrical conduit to strategically reinforcing the hot tub area, each decision is made with precision and foresight. With marine-grade plywood flooring from pontoonstuff.com, they elevate the vessel to new heights of luxury and durability. In the world of boat construction, where every decision can mean the difference between smooth sailing and disaster, the team at B is for Build proves time and time again that they are masters of their craft.
Image copyright Youtube
Image copyright Youtube
Image copyright Youtube
Image copyright Youtube
Watch Building My Dream Yacht From Scratch Pt 9 - Coast Guard Stability Tests and Certification! on Youtube
Viewer Reactions for Building My Dream Yacht From Scratch Pt 9 - Coast Guard Stability Tests and Certification!
Suggestions for improving the black water tank, including adding straps, using larger pipes, and considering a macerator
Concerns about the electrical components in the hot tub enclosure and the need for waterproofing
Recommendations for additional support and bracing for the boat structure
Suggestions for separate grey water tank for sinks and ensuring proper drainage
Comments on the need for waterproofing the plywood decking
Concerns about the placement and protection of the black water tank
Ideas for storage compartments and hatches on the boat
Comments on the potential weight capacity of the boat's second floor
Questions about the helm location and the use of a macerator toilet
Various comments on insurance and boat safety
Related Articles
SEMA Build Update: Fitting 1967 Mustang Panels onto 2019 GT | B is for Build
In part 2 of this build series from B is for Build, the team continues their SEMA build project by trimming and fitting reproduction 1967 Mustang Fastback body panels onto a 2019 Mustang GT. They also thank their sponsor, Omni Heroes, a heroic fantasy casual strategy RPG game. The team showcases their progress as they meticulously align and modify the car to resemble the iconic 1967 GT500.
1967 Mustang Fastback Shelby Tribute Build: Mock-Fitting Doors, Hood, and Fenders
In this episode of B is for Build, the team continues working on their 1967 Mustang Fastback Shelby tribute build. They focus on mock-fitting the doors, hood, fenders, and front bumper to ensure proper alignment. They also remove unnecessary components from the front end to create more space and prepare for permanent installation. The team is excited about the progress they have made and are pleased with the results so far.
1967 Mustang Fastback Body Swap: Building a Shelby Tribute Car for SEMA
In this episode of B is for Build, the team works on a 1967 Mustang Fastback body swap, transforming a 2019 Mustang GT into a Shelby tribute car for SEMA. They tackle tasks like installing wheels, suspension, side skirts, and the rest of the body. The rear bumper is modified for safety, and the fenders are permanently mounted. They also work on the hood and modify a side skirt for a Shelby GT500-inspired look. Despite being behind schedule, the team remains determined to complete the project.
Body Swapping a Shelby GT500 Tribute Car: Electronics, Test Drive, and Challenges | B is for Build
In this episode of B is for Build, the team continues their body swap project, working on the electronics and test driving the Shelby GT500 tribute car. They also thank their sponsor, Shopify, and highlight its benefits for businesses. The team tackles various challenges, including aligning the rear bumper and resolving issues with the trunk and hood. They install new Corbeau seats and focus on wiring and door functionality. The episode ends with the team reflecting on their progress and the upcoming SEMA event.