DailyDrivenExotics: Exciting HQ Update and F12 Progress
- Authors
- Published on
- Name
- Dushyant
- @dishs
DailyDrivenExotics has faced a bit of a conundrum, my fellow petrolheads. Their current headquarters, a place they've called home for the past two years, is no longer suitable for their needs. But fear not, for they have applied for not one, but two new locations! The anticipation is palpable as they await the outcome, hoping that they will secure one of these larger spaces within the next five days. Moving twice would be an absolute nightmare, so let's keep our fingers crossed for them.
Now, let's talk about the cars. Oh, the glorious machines that grace the DDE fleet. They have come up with a plan for half of the stuff, and by stuff, I mean the cars. You see, in the past, they had parked some of their beauties at a secure parking lot, courtesy of Avenue the Arts. But now, with the impending move, they need to find a temporary home for these magnificent beasts. The thought of them being tucked away in storage is simply heartbreaking, isn't it?
But let's not dwell on the potential sadness, my friends. There is hope on the horizon. The new locations they have applied for are absolutely massive, dwarfing their current abode. Imagine the possibilities! They could drive their full-size cars inside the building, no need for straps or restraints. Burnouts and jumps could be a regular occurrence. And if that's not enough, they even have plans for a go-kart track. Yes, you heard me right. A go-kart track inside their HQ. It's madness, but the good kind of madness that we all love.
But let's not forget about the work being done on their beloved F12. The team has been hard at work, crafting a work of art in the form of a front end. The fenders and bumper are now in place, and oh boy, does it look stunning. The welding skills on display are truly impressive, my friends. And the exhaust pipes, oh my! They are a sight to behold. Dual 3.5-inch pipes coming out of the turbos, with dump pipes for the wastegates. It's a work of engineering brilliance, my fellow enthusiasts.
There is still work to be done, of course. The plumbing, the wiring, the diff, the axles, the drive shaft, and let's not forget about the engine. Each cylinder needs to be machined for each piston, ensuring precision down to the hundredth of a thousandth of an inch. It's a painstaking process, but one that will result in a masterpiece of an engine. And let's not forget about the custom intake manifold being made in Sweden. It's going to be a game-changer, my friends.
So, as we eagerly await the outcome of their HQ search, let us revel in the excitement of what's to come. The potential for epic videos, the roar of engines, and the sight of flames shooting out of the top of the F12. DailyDrivenExotics is on the brink of something truly extraordinary, and we can't wait to see it all unfold.
Watch REVEALING OUR 2 NEW DDE HQ LOCATIONS … on Youtube
Viewer Reactions for REVEALING OUR 2 NEW DDE HQ LOCATIONS …
- Tim's burnout was entertaining and nerve-racking
- Damon stuck up for Dave's passion
- Shawn's presence is appreciated and adds to the team dynamic
- Mike, Tim, and Shawn's hard work is praised
- Excitement for the new HQ and upcoming car builds
- Concerns about not overspending and having to sell cars
- Appreciation for the team's enthusiasm and dedication
- Desire to see more driving content in the videos
- Positive comments about the tight-knit team and their chemistry
- Viewers express their regular support and enjoyment of the videos